Contact us Home Chinese Traditional Version

  Contact us      Home        Chinese

  About Yi-AnSolutionsProductsTechnical Services
 

 Technical Services & Products

ILSP
Technical Review
NSN Codification
Technical Manual
IETM
LSAR
Training for ILS
Technical Consultant

 Products

CBRN Product
 ‧EasyDecon

 

 

 

 

 

Integrated Logistics Support Plan, ILSP

The main objective of ILSP is to plan the items of integrated logistics support for weapon systems. By means of the effective resource managing procedures and confirmed , analyzed , planned requirement of weapon systems, then ensure the weapon systems can operate effectively and keep the readiness under a reasonable and affordable life-cycle cost.
Our company will follow the rules and guidelines of integrated logistics support plan of military to tailor and develop project's ILSP for clients.

Technical Review


According to the project's contract, we will assist and review the ILS technical information, documents and provide our opinions, suggestions and the way of improvement for technical documentation.

  1. We assist and examine our client's service bill of material (including part number, model catalog, blueprint, and manufacturer information), analysis of maintenance (regularly and irregularly), resources needed ( including support equipment, repair material, technical manual, and training etc.) and  information of FMECA.
     

  2. According to the MIL-STD-40051A, we give clients assistance and examination of the draft technical books (media format) among including regularly maintenance regulations (including item of maintenance and time), and operation manual etc.
     

  3. We assist examination of the initial spare parts, support and test equipment. And we also help planning for spare parts , support and test equipment.
     

  4. We exam CALS information system related to the installation documents.(ex: software requirements, design and examination)


National Stock Number Codification


According to 「Procedure for Military of National Stock Number」, our company exams and also review military projects and provide verification of the information (including part number, catalog, model, blueprint, and company's contact detail) . We also check from NSN database to find out the part is assigned its number or not, and provide National Stock Number Codification service. Finally, we will present list of our suggestion and soft copy.

1. Verify whether it is assigned by national stock number?

2. Check if the item name and item name code is suitable or not?

3. Check whether FSC is suitable or not?

4. Check whether cage code is correct or not?

5. Check if the description of NIIN is complete or not?

Technical Review


According to MIL-STD-38784 and MIL-STD-40051 U.S. military standard and buyers' requirement, We could assist ours customers to develop the technical manuals of operator level, unit maintenance level, lubrication intermediate maintenance level, repair parts and special tools list and depot overhaul level etc.

  

Interactive Electronic Technical Manual, IETM



We take US Military MIL-PRF-87268, MIL-PRF-87269 to develop the forth class IETM including operation manual, maintenance manual, parts manual, lubrication manual, overhaul manual.

Our company has developed disk version and web version IETM to respond current market so far.

We can have customized 3D components display function.

Logistics Support Analysis Record, LSAR


We take US army MIL-STD-1388-2B, MIL-PRF-49506 and MIL-HDBK-502 to develop a logistics support analysis record database fit for the client.

Including :

  1. Service Bill of Material
  2. Maintenance Planning
  3. Task Analysis
  4. Supply Support
  5. Support and Test Equipment
  6. Facilities
  7. Manpower, Personnel, and Training
  8. Packaging, Handling, Storage, and Transportation

Training for ILS


  1. Integrated Logistics Support Plan, ILSP

  2. Continuous Acquisition and Life-Cycle Support, CALS

  3. National Stock Number Codification

  4. Technical Manual (TM), and Interactive Electronic Technical Manual (IETM)

  5. Logistics Support Analysis Record, LSAR
     


Technical Consultant


  1. ILS

  2. Continuous Acquisition and Life-Cycle Support plan

  3. New bid, technical proposal presentation, ILS plan

  4. Project contract and risk management

  5. Review technical documents

  6. IETM and LSAR database design

  7. National Stock Number Codification

  8. Maintenance planning and task analysis
     


 
 

© 2009 YI-AN TECHNOLOGY LTD.
5F.-1, No.100, Sec. 2, Zhongshan Rd., Banqiao City, Taipei County 220-67, Taiwan (R.O.C.)
Tel:+886-2-7730-8585 , Fax:+886-2-2964-8355